- Standard Installation includes the following
- Up to a 5-meter copper pipe with insulation is included
- Standard wire is included in the AC packing box.
- Additional AED 75 per meter charges will apply for extra pipe if required.
- AED 75 will be charged for the Wall Bracket if required.
- If the customer requests the use of specific materials, such as a specific cable type or pipe, it will be provided by the customer. This includes but is not limited to, specific cable types and specific pipes.
- If the use of a Forklift, Heavy Lifting Equipment, Crane, or Generator is required, the customer will be responsible for providing them or bearing the associated charges.
- Any plumbing work, interior work, masonry work, electrical work, or any other activity not within the scope of our installation services is not included.
- Installation using old or used pipes is strongly discouraged. If the customer insists on using them, it will void the warranty for both the air conditioners and the installation.
- The warranty does not cover any services or cleanliness-related matters.
- An electrical point or socket should be readily available at the installation location. Our installation team will not perform any tasks related to electrical work.
- The customer is responsible for ensuring the appropriate cooling capacity of the air conditioner according to the area. No claims can be made after the installation, except for technical faults.
- Anything outside the scope of our installation services is not included.
Please note: The provided terms and conditions are subject to change and further clarification, if necessary.